Main references (OCDE) (*)
(*) References in italics have generally been made under the guise of EQE. They represent a sample of the EQE studies carried out in the nuclear field in the years 1990 to 2000 by those now involved in the agreement between GDS and EQE Consulting.
Project | Date | Country | Nature of the project |
---|---|---|---|
EPS on ATR reactors |
1990 |
USA |
Realization of an EPS comparing different natural hazards for EG & amp; G |
EPS on ABWR reactors |
1990-1991 |
USA |
ABN Reactors Review for BNL |
Loviisa NPP |
1990-1991 |
Finland |
Assessment of the seismic fragility of the Loviisa plant |
Electric Relay Fragility Curves |
1991-1992 |
USA |
Analysis of the seismic fragility of electrical relays for seismic EPS for ATR (EG & amp; G) |
NRC-SBIR Program |
1991-1992 |
USA |
EPS on "& nbsp; Low Power Shutdown Conditions" |
Fuji Research Institute |
1992-1993 |
Japan |
Database and software dedicated to the realization of seismic EPS for the FRIC |
Temlin NPP |
1994-1995 |
Czech Republic |
Fragility Analysis for TemUS NUS Corporation |
Oskarshamn Unit 2 |
1996 |
Sweden |
ADM study on Oskarshamn plant for OKG Aktiebolag |
Ulchin NPP |
1996 |
Korea |
General Review of a Seismic EPS for Ulchin Power Station (KEPCO) |
Tricastin |
1996-1999 |
France |
Tricastin's SMA study for EDF |
FBR Insulation (MISTUBISHI) |
1997 |
Japan |
Seismic risk analysis for an FBR reactor on seismic supports |
IPEEE |
1997-1998 |
USA |
IPEEE Program Expectations Report for the NRC |
ABWR from GE |
1999 |
USA |
Seismic walkdown of an ABWR for General Electric in San-Jose |
PSA GCR (BRITISH ENERGY) |
1999-2000 |
UK |
Seismic EPS Optimization for RAG Nuclear Power Plants |
SYSCO Distribution Center |
2004-2006 |
United States |
Seismic risk analysis for SYSCO installations on 8 sites |
CODELCO Copper Foundry |
2006 |
Chile |
ADM Study of the CODELCO Copper Foundry |
Cal-Arp (California Accidental Release Prevention) |
2008-2010 |
United States |
Upgrading the principles for conducting seismic EPS on the chemical industry |
PLUSPETROL LNG installation |
2008 |
Peru |
Study of the seismic vulnerability of liquefied natural gas installations |
Nevada Energy Corporation Power Plants |
2009-2010 |
United States |
Seismic EPS on power plants in Southern Nevada and exploitation of results for T = 475 years |
Diablo Canyon NPP |
2010 |
United States |
Calculation of fragility functions for DC power supply equipment |
Philipps Electronics |
2011 |
United States |
SMA study of an electronic component manufacturing plant in San Jose |
AUROCO Factory |
2012 |
Chile |
Inspection following the 2010 earthquake and SMA study of one of the largest paper mills & nbsp; of Chile |
Clear Air Force Base (Alaska) |
2012 |
United States |
Seismic qualification of power plant components powering a military base |
Westinghouse CFFF (SMA) |
2012 |
United States |
ADM study of the Westinghouse fuel fabrication plant in Columbia for NRC instruction |
Mission Onagawa |
2012 |
Japan (IAEA) |
Analysis of the effects of the Tohoku earthquake on the Onagawa plant on behalf of the IAEA |
RCC-CW Writing |
2013 |
France |
Editorial Support for the RCC-CW Appendices ADM and HCLPF |
Saint-Alban Bridge BK |
2013 |
France |
ADB study of the BK bridges at the Saint-Alban power station |
Tricastin EPS |
2014-2015 |
France |
Conducting seismic EPS (capacity) integrating more than 1000 equipment on the Tricastin CNPE |
Bugey EPS |
2015-2016 |
France |
Conducting seismic EPS (capacity) integrating more than 1000 equipment on the Bugey CNPE |
Induced Effects |
2016-2017 |
France |
Analysis of induced effects for Bugey installations |
EPS de Chinon |
2017 |
France |
Conducting seismic EPS (capacity) integrating about 1000 equipment on the CNPE of Chinon |